Fully Reversible Combination Windows

There’s no doubt about it – BJM’s combination windows owe their well-deserved popularity to their astonishing versatility. By combining high-performance components with imaginative design and engineering, we’ve created an attractive and innovative window offering a variety of opening configurations in one package.

Choose from a side or top projecting opener, a fully reversible top or side swing, or even standard butt hinges – the real beauty is that a single great-looking window offers a fantastic range of opening options for every situation.

Fully Reversible Combination Windows

Timber

Grade 1 Scandinavian Redwood taken from sustainable sources. Complies with BS EN 942: 1996.

Construction

Every window is manufactured to comply with BS644.

Preservative

Every component of every window is preserved before assembly and paint application.

Adhesives

We use high-quality adhesives providing excellent strength, durability and water resistance, and which comply with BS EN 204 D4.

Weather seal

All our combination windows are supplied with weather seals as standard. Seals are paintable and guaranteed against shrinkage if applied and maintained as recommended.

Ironmongery

Ironmongery generally complies with BS6462: 1994.

Our openers are generally hung using market-leading PN hinges. Standard windows are supplied with espagnolete locking, though we offer a range of alternative locking mechanisms including shootbolt locking.

Fasteners, casement stays and other handles are available in a wide range of finishes.

Ventilation

All windows can feature flush-fitting ventilators for constant airflow.

Factory finish option

Windows can be paint finished to any RAL or BS number/reference and supplied factory glazed. Windows are finished using a waterborne high-build coating system.

Windows are glazed using Double Glazed Units manufactured and tested to BS EN 1279, and comply with Part L of Building Regulations for improved thermal insulation.

For increased lifespan, factory glazed units are installed using a drained and vented method to BS6375 part 1989.


Designed & Built by Dulay Seymour

Accreditation Marks